翻訳と辞書 |
Hatfield Colliery : ウィキペディア英語版 | Hatfield Colliery
Hatfield Colliery, also known as Hatfield Main Colliery, was a colliery in the South Yorkshire Coalfield, mining the High Hazel coal seam. The colliery was around northwest of Hatfield, South Yorkshire, adjacent north of the railway line from Doncaster to Scunthorpe (former South Yorkshire Railway, or ''Barnsley to Barnetby Line'') northeast of Hatfield and Stainforth railway station. The colliery opened in 1916. The pit was stopped in 2001, and restarted 2007; the mine passed through a number of different owners in the early part of the 21st century, with subsequent operators entering receivership. During the same period the site was proposed as the location for high-technology coal burning power stations schemes which did not proceed. In 2013 the major Doncaster-Thorne railway line which connected South Yorkshire to the Humber ports and Scunthorpe was blocked by a landslip at the colliery spoil for around 6 months. From late 2013 the mine was employee owned by the 'Hatfield Colliery Partnership Limited'. Due to lack of demand for coal products the colliery shut down at the end of June 2015. ==History==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Hatfield Colliery」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|